Al Abdaliyah Integrated Solar Combined Cycle (ISCC)

AlAbdilyah Integrated Solar Combined Cycle ( ISCC) is an Initiative  from the private sector to Kuwait Authority for Partnership Projects. The project consists of ....
 

AlAbdilyah Integrated Solar Combined Cycle ( ISCC) is an Initiative  from the private sector to Kuwait Authority for Partnership Projects. The project consists of Combined Gas Turbine unit and Solar Island.

The total capacity of the power plant will be 280 MW, with a solar contribution of 60 MW. The plant’s utilization of solar energy will contribute to fuel saving.

An additional environmental benefit is that annual CO2 emissions will be 48,000 tons less than that emitted in a conventional plant of comparable capacity. The plant will provide services more efficient than that of a conventional combined cycle power plant, with stable continuous power generation.



  • Q3

    2013
    Appointing Transaction Advisor
  • Q4

    2013
    Final Review of Feasibility Study
  • Q1

    2014
    Inviting for Expressions of Interest
  • Q2

    2014
    Inviting for Requests for Qualification
Email: iscc@ptb.gov.kw
 


or fill in the form below


First Name*
Last Name*
Email*
Confirm Email*
Mobile Number
Mobile Number
Message
 
Fields marked with (*) are mandatory
 
 
Main Contact
iscc@ptb.gov.kw
Public Entity

Ministry of Electricity and Water

http://www.mew.gov.kw
Related Downloads

There are no downloads for this project

© Copyright 2015 PTB. All rights reserved    Sitemap
Follow us on
Twitter Instagram